BLACK SEA SHORE - PODISOR NATURAL GAS TRANSMISSION PIPELINE
PODISOR
45.5 km 1016 mm
2025
RHINE WATER TRANSPORT PIPELINE (RWTL) PROJECT
RWE POWER AG
30.5 km 2235 mm
2025
ROB1 24" SPI BIS DJAMAA SP3 MSILA
ENAC
306.5 km 610 mm
2025
AVAL FOUKA LOT N01
EURL STRAPHYD
14.2 km 1219 mm
2025
AVAL SDEM
SPA COSIDER CANALISATION
14.5 km 508 mm
2025
CHIALI PROJET MILA
SPA CHIALI SERVICES
25.5 km 711 mm
2025
CHIALI PROJET MILA
SPA CHIALI SERVICES
3.5 km 559 mm
2025
CHIALI PROJET MILA
SPA CHIALI SERVICES
4.45 km 457 mm
2025
REMPLACEMENT L'OLEODUC OD1 EN 16" TRONCON PC1- TA/MESDAR
ENAC
50 km 406.4 mm
2025
EURL STRAPHYD
EURL STRAPHYD
31.23 km 1422 mm
2025
GGI 42" HASSI R'MEL - SC3 MOUDJEBARA
ENAC
75 km 1067 mm
2025
Travaux de revetement tri-couches 3LPP de pipes 12''x60, épaisseur 10,97, au niveau deu project LD2 Hassi R'Mel
GCB/DTC
12'', 6'' 25000ML
2024-2025
Réalisation EN EPC d’un réseau de collecte et installations de surface pour le raccordement de 18 puits vers les installations existantes de Rhourde-Nouss. 2025 8" et 6" 31 000 SHERWINWILLIAMS 720G020S PIPECLA
COSIDER CANALISATION
8'', 6'' - 31.000 ML
2024
EPCM for BAB Far North Full Field Development Project (BFN)
ADNOC Onshore
3 inch to 18 inch (seamless pipes), various thickness, length of each pipe 12mtr, total length 184km
2024
Raya Project
Equinor
180 km x30'' dia x 34mm
2024
Duplicar Oil Line
Oldeval (Argentina)
455 k x 24'' dia - Different wt
2024
Roma Acquedotto Marcio
5,4 km
2024
Orleans Bridge Project
2,3 km
2024
KKTC Orta Mesarya Ovasi Sulamasi
7,9 km
2024
Eregli-Ivriz Sag Sahil Sulamasi Yenileme Çelik Boru Temini 4.Kisim
15 km
2024
DSI MARDIN 2.KADEME ?CMESUYU HATTI
10 km
2024
Toscelik Kalyon avrupa Hatti
3,4 km
2024
NEOM Project
NEOM
9,1 km
2024
DSI IVRIZ 5.BOLGE
14 km
2024
DSI PAMUKLUK ICME SUYU
7 km
2024
TRANSGAZ JUPA
140 km
2024
TRANSGAZ MINTIA
20,4 km
2024
Sonelgaz - Transport Gaz Spa
Sonelgaz
28" - 24,29 Km
2024
EPE SPA ANBT IC
SPA COSIDER
32" - 15,99 Km / 48" - 14 Km
2024
SPA COSIDER CANALISATION
SPA COSIDER CANALISATION
80" - 0,96 Km
2024
SOGERHWIT
40" - 73,38 Km
2024
EURL STRAPHYD
EURL STRAPHYD
48" - 7,8 Km
2024
ENAC SPA
ENAC SPA
24" - 90,93 Km
2024
EURL TGCTP
EURL TGCTP
32" - 0,33 Km / 48" 24,18 Km
2024
Rhine Water Transport Pipeline (RWTL) Project
RWE Power AG
88" - 10,63 Km
2024
COSIDER AVAL
SPA COSIDER CANALISATION
28" - 0,54 Km / 40" - 40,93 Km / 56" - 20,28 Km / 60" - 18,91 Km / 80" - 13,67 Km
2024
TRANSGAZ
40" - 54.95 Km / 48" - 3,97 Km
2024
Prestation de revetement exterieur tri-couche en polypropylene «3LPP » des tubes de gaz en acier 06"
GCB/DTC
6'' - 15 ML
2024
ZOP 2
Fluxys
40'' - 28,188 Km
2024
Augusta
Bayernets
28'' - 42,029 Km
2024
SNAM/ Adriatica
SNAM
30'' - 40,079 Km // 56'' - 6,291 Km // 48'' - 58,732 Km
2024
Etzel-Wardenburg
OGE
48'' - 56,067 Km
2023
Fenix Project
Total Energies
39Km - 4'' x 11,3mm // 4'' x 4,37mm // 4'' x 4,78mm
2023
Gasoducto Presidente Néstor Kirchner ( GPNK) -Argentina
Enarsa ( Energia Argentina S.A.)
573km - 36''
2023
EPC FOR BABA FACILITIES UPGRADE PROJECT
ADNOC ONSHORE / ROBT STONE
3,5", 4,5", 6,625", 8,625", 10,75", 12,75" - 134,1 KM
2023
Realisation en EPC du reseau de collecte pour le raccordement de 73 puits de Tinhert a Alrar
GCB/DEP
18'', 12'', 8'', 6'' - 144 ML
2023
PRESTATION D’ENOROBAGE A CHAUD DU PIPE 16’’
SARPI SPA
16'' 55 ML
2023
Revetement tri couches en polypropylene 3LPP des tubes nus diametre 08" epaisseur 10,31
GCB/DTC
8'' - 25,1 ML
2021-2022
Saline Water Pipeline
Saudi Arabia's Saline Water Coversion Corporation (SWCC)
Not given
2022
Collahuasi Chile Mine Water Pipeline Project
Compania Minera Dona Ines de Collahuasi SCM
km 200 - 44'' LSAW pipes ( CPW pipes)
2021
Bisat Phase 2 Field Development
Oman Oil (OQ)
L415/X60MS - 24"/10'' - 11.13/ 5.6 mm
2021
Onshore projects
Snam Rete Gas
60 Km different diameters and thickness
2021
Offshore projects
Tenaris (c/o Geocean)
3 Km 400mm x 12,7mm
2021
Baltic Pipe Onshore Project
GAZ System
40'' OD x14,2mm WT quantity 11.700 meters / 40'' OD x 22,2mm WT quantity 700meters
2021
Israel Natural Gas Line INGL
Israel Natural Gas Lines Ltd
2021
Israel Natural Gas Line INGL
Israel Natural Gas Lines Ltd
2021
North Saini Project
Nospco
23 Km 8" &10''
2021
Agiba Pipeline
Agiba
8"
2020
Interconnector Greece-Bulgaria project onshore
ICGB
32''
2020
Baltic Polen Offshore Project
GAZ System
2020
Extended Well Test Of Mahani-1 (pre-issued pipes)
Sharjah National Oil CO
L415/X60QS 16" - 21.4mm
2020
Bisat Phase 2 Field Development
Oman Oil (OQ)
L415/X60MS - 10" - 8.7 mm
2020
Onshore projects
Snam Rete Gas
different diameters and thickness
2020
Onshore projects
Vallurec ( c/o Sonatrach)
50 Km 150mm x different thicknesses
2020
Onshore projects
Vallurec ( c/o Sonatrach)
50 Km 150mm x different thicknesses
2020
Iskenderun TDC Liman Projesi
Tosyali Demir Celik
1,1 Km 406,4 x 8 mm - 1,1 Km 508 x 8 mm - 610 x 8mm
2020
Aliaga- Kinik Dogalgaz Boru Hatti
Botas
13,197 Km 508 x 6,4 mm
2020
Aliaga- Kinik Dogalgaz Boru Hatti
Botas
2,114 Km 508 x 7,14 mm
2020
Nurdagi Dogalgaz Deplasesi Projesi
Firat Insaat
1016 x 12,1 mm / 1168 x 12,1 mm
2020
Denizli Icme Suyu Ishale Hatti
DSI
8,2 Km 1118 x 8,8 mm
2020
Gaziantep Icme Suyu Ishale Etti
DSI
5,2 Km 1219 x 10 mm
2020
Tuz Golu Dogalgaz Depolama Projesi
China Camc Engineering Co.Ltd .Ic
73 Km 1321 x 11,13 mm / 1321 x 12,70 mm / 1524 x 12,7 mm / 1524 x 14 mm
2020
Terkos Ikitelli Isale hatti
ISKI
2 Km 2540 x 21 mm
2020
Petrobel Pipeline
PTB
24"
2020
Wepco Elhamara
Wepco
6" & 42"
2020
Abo Soltan HDD
Gasco
2,5 Km 16"
2020
Agrood pipeline
Enppi
3"
2020
Agiba pipeline
Agiba
6 Km 4"
2020
El Hamad Pipeline
GPC
6,3 Km 6"
2020
Suez Petroleum Pipes
SMP
4,5 Km 24"
2020
El Hamra Abo Sanan
PPC
166 Km 12"
2020
Borug El Arab Pipeline
Gasco
30 Km 24"
2020
Hurgada Safaga pipeline
Gasco
39,6 Km 24"
2020
El Amriea El Alameen
Gasco
125 Km 32"
2020
El Teana Meet Nama
Gasco
170 Km 42"
2020
JET Feul Pipeline
MPC
49,5 Km 12"
2020
GPC pipeline
GPC
17,5 Km 8"
2020
Revin pipeline
Gasco
70 Km 30"
2020
IPIC Pipeline
IPIC
7 Km 30" & 36"
2020
Damietta Tanta
IPIC
120 Km 8"
2020
Not given
SWCC
34”
2018-2020
Saline Water Pipeline
Saudi Arabia's Saline Water Coversion Corporation (SWCC)
Sécurisation de l'alimentation en eau potable de la ville de Béchar
Razel
2018-2019
SH/TRC/EGPDF et PS04-GR5
2019
Transfer d'eau du barrage Tabellout (RAZEL)
Razel
2019
Polish Gas Pipeline System expansion by Gaz System S.A.
Gaz System S.A.
40” - ca. 38 000 km in various parts, “Pogórska Wola – Tworzeń pipeline”, “Strachocina – Poland/Slovakia border pipeline”
2019
Zeelink
2018-2019
Ballough Bypass
1 Km
2018-2019
Tsechechische Republik
NET4GAS s.r.o.
2019
Pijp G300
2019
CAPACITY4GAS
NET4GAS s.r.o.
96 Km
2019
EBK
NET4GAS s.r.o.
2019
Flughafen Muenchen
2017-2019
Nordstream 2
Nord Stream AG
200 Km
2019
Water Pipe
200 Km
2018-2019
GSA Algeria
GSA
200 Km
2019
Gaziantep Icme Suyu Ishale Etti
DSI
20 Km 1219 x 10 mm / 2438 x 22 mm
2019
Brau Dogalgaz Boru Hatti
Romanya
133,5 Km 813 x 10 mm / 813 x 11 mm / 813 x 14,2
2019
Terkos Ikitelli Isale Hatti
ISKI
13 Km 2540 x 21 mm
2019
Turk Akimi Dogalgaz Boru Hatti
Botas
35,5 Km 1219 x 14,2 mm /1219 x 20 mm
2019
Afyon - Seckoy Dogalgaz Boru Hatti
Botas
42 Km 1016 x 11,9 mm
2019
Pharaonic Petroleum
PGPC
6 Km 10"
2019
South Dapha
Bader PC
1,5 Km 3" & 4"
2019
Asuit Co Pipeline
Asuit
1,5 Km 4" & 6"
2019
El Naftha Project
Asuit
different diameters
2019
Khalda Pipeline
Khalda
65,5 Km 10" & 16"
2019
Mustrad el Suez
PPC
2,5 Km 12"
2019
Ras Gara Phase 2
PTB
37,6 Km 10"
2019
El Tebeen El Sokhna
PPC
53 Km 24"
2019
Khalda Pipeline
KPC
5 Km 8"
2019
Cooling station of new capatial
Gas Cool
7,7 Km 32"
2019
Khalda Pipeline
KPC
12,6 Km 12" &4"
2019
Rehabilitation old pipeline
PPC
8,2 Km 16"
2019
Not given
KOC
8”
2019
Rehabilitation old pipeline
PPC
8,2 Km 16"
2019
Bat-Apries Pipeline project
Khalda Petroleum Co.
10" 27 Km - 16" 42 Km
2018
Zohr Development Project
Sumitomo/Petrobel
25 Km 22'' x 25,4 mm
2018
Zohr Development Project
Sumitomo/Petrobel
25 Km 22'' x 25,4 mm
2017-2018
Zohr Phase II
Petrobel
8" - 14" - 30" 310 Km
2018
Elteena Elasmaa
Gasco
42" 165 Km
2018
Nidoco
Petrobel
24" - 26" 32" 165 Km
2018
EPC for Refinery Expansion Tankage Facilities - Pipeline Works Overseas AST Co. L.L.C.
ENOC Processing Company L.L.C.
8" x 8,18 mm
2018
Elteena Elasmaa Phase II
Gasco
42" 70 Km
2018
Zohr Phase III
Petrobel / ENI
30" 75 Km
2018
Sécurisation de l'alimentation en eau potable de la ville de Béchar
Razel
2017-2018
Sonatrach
Sonatrach
2018
Turkish Stream
Botas
22 Km 48''
2018
Eustream Slovakia
75 Km 40''
2018
Terminal Piling Pipes
Botas
7 Km 900-1200-1400 mm
2018
Middle East Piling Project
21 Km 16-20-24''
2018
Terkos Water Pipeline Project
Iski
3,5 Km 100''
2018
Middle East Water Pipeline Project
43 Km of several diameters
2018
Gaziantep Drinkable Water Pipeline
33,5 Km 2642-2438-1219 mm
2018
Elazig Drinkable Water Pipeline
20 Km 1524 mm
2018
Trabzon Drinkable Water Pipeline
23 Km 711-813-914-1016-1118-1626-1727 mm
2018
Brau natural Gas Pipeline
79 Km 813 mm
2018
Botas Aliaga DGBH
Botas
22 Km 914 mm
2018
Stationsrohre Eugal
Gascade Gastransport
4 km
2018
Etzel-Suedfeldleitung
2018
Stationsrohre Radeland
1,5 km
2018
Stationsrohre Lubmin
1,1 Km
2018
Goleniow-Ploty - GAZ System
GAZ System
5,8 Km
2018
Open Grid
2018
Flaboform
2018
Stahlrohr
2018
Not given
Not given
0,6 Km - 457mm
2018
Elteena Elasmaa
Gasco
42" 165 Km
2018
EPC for Refinery Expansion Tankage Facilities - Pipeline Works Overseas AST Co. LLC
ENOC Processing Company L.L.C.
8" x 8,18 mm
2018
Nidoco
Petrobel
24" - 26" 32" 165 Km
2018
Zohr Development Project
Sumitomo/Petrobel
25 Km 22" x 25,4 mm
2017-2018
Zohr Phase II
Petrobel
8" - 14" - 30" 310 Km
2017
Drinking Water Project - Trabzon
Kalyon/DSI
47,7 Km 711-2032 x 7,1-17,5 mm - Steel grade S275JR
2017
Goksu Basin Based Water Supply Project - Gaziantep
Kaylon/DSI
120 Km 1422-2642 x 10-25,4 mm - Steel grade S275JR
2016-2017
Nurdagi Crude Oil Pipeline - Gaziantep
Botas
24,5 Km 457-1168 x 7,1-11,9 mm - Steel grade X65M
2016-2017
Nord Stream II-III° Pipeline
Nord Stream AG Consortium Germany Russia
48" x 26,8-34,9- 41 mm - Steel grade X70
2016-2017
Not given
Mavi Tünel
10 Km 610mm -1829mm -1016mm
2016-2017
Düzce Project
Botas
65 Km 508mm
2016-2017
Sirnak Project
Botas
55 Km 323 mm
2016-2017
Water Pipeline Project
Iski
33 Km 1016mm -914mm -813mm -1219mm
2016-2017
Not given
Israil Gas
21 Km 914 mm
2016-2017
Lübnan Project
Not given
5 Km 1730 mm
2016-2017
Hakkari Project
Botas
3 Km 1016 mm
2017
Nord Stream II - III° Pipeline
Nord Stream AG Consortium Germany Russia
48" x 26,8-34,9-41 mm - Steel grade X70
2016-2017
Zohr Development Project Accelerated Phase
Saipem / Petrobel
79 Km 8" x 20,2 mm / 229 Km 14" x 23,2 mm / 75 Km 26" x 38,8 mm
2017
WND Phase 2 GFR
Subsea7 / BP
230 Km 24" / 75 Km 6"
2017
Eni Zohr Phase I Field Development Offshore Egypt
Eni Zohr Phase I Field Development Offshore Egypt
30"
2017
Zohr Phase I
Petrobel
8" - 14" - 26" 235 Km
2016-2017
Sonatrach/TRC/GR7
Sonatrach
2017
Projet Chitt El Gherbi
2017
Eni Zohr Phase I Field Development Offshore Egypt
Eni Zohr Phase I Field Development Offshore Egypt
30"
2017
Not given
KOC, SWCC
4” , 80”
2016-2017
Zohr Phase I
Petrobel
8" - 14" - 26" 235 Km
2017
Nord Stream II - III° Pipeline
Nord Stream AG Consortium Germany Russia
48" x 26,8-34,9-41 mm - Steel Grade X70
2017
Eni Zohr Phase I Field Development Offshore Egypt
Eni Zohr Phase I Field Development Offshore Egypt
30"
2016-2017
Zohr Development Project Accelerated Phase
Saipem/Petrobel
79 Km 8" x 20,2 mm / 229 Km 14" x 23,2 mm/75 Km 26" x 38,8 mm
2016-2017
Nord Stream II-III° Pipeline
Nord Stream AG Consortium Germany Russia
48" x 26,8 - 34,9 - 41 mm - Steel grade X70
2016
Zohr Development Project Accelerated Phase
Petrobel
170 Km 219 x 20,6 mm / 1,2 Km 380 x 36,4 mm
2016
Sonatrach/ROB 1 Bejaia-M'Sila
Sonatrach
2016
Not given
PDO, KOC
4”, 6”, 8”, 12”, 40”, 48”, 56”, 64”
2016
Zohr Development Project Accelerated Phase
Petrobel
170 Km 219 x 20,6 mm/1,2 Km 380 x36,4 mm
2015
Not given
KOC, SWCC
4”, 6”, 80”
2014-2015
SH/TRC/GR6
Sonatrach- Algeria
48" - 466 Km
2014-2015
SH/TRC/RGG1
Sonatrach- Algeria
42" - 169 Km
2014-2015
SH/TRC/TAM 16
Sonatrach- Algeria
16" - 400 Km
2014
Not given
KOC, PDO
6”, 8”, 12”, 16”
2014
South Stream -1st Pipeline
South Stream Transport B.V.
1st pipeline string with pipe diam. 813mm x 39mm ( total km 931)
2014
South Stream - 1st Pipeline
South Stream Transport B.V.
1st pipeline string with pipe diam 813 mm x 39 mm (total km 931)
2014
South Stream - 1st Pipeline
South Stream Transport BV
1st pipeline string with pipe diam 813 mm x 39 mm (total km 931)
2013
Not given
KOC
4”, 6”, 8”, 10”, 12”
2012-2013
Yadana Gas Field
Total E&P Myanmar - Myanma Oil & Gas Enterprise ( MOGE)
Not given
2012-2013
GR5 Sonatrach TRC/GR5
Sonatrach- Algeria
48"
2012-2013
Nafthaneh to Baghdad Pipeline
Baghdad - Iraq
1.219,2 mm x 17,5 - 13,106 km/ 1.219,2 mm x 17,5 x 5,899 km - 1.219,2 mm x 25,4 x 9,004 km / 1.219,2 mm x 17,5 x 5,980 km - 1.219,2 mm x 17,5 x 14,381 km / 1.219,2 mm x 17,5 x 1,139 km
2012-2013
Algeria Petroleum Pipeline Project
Algeria Petroleum
1.066 mm x 52,052 km
2012-2013
Water Pipeline - Lebanon Potable Water Project
Lebanon Potable Water
323/1.420 mm x 33,668 km
2012-2013
Water Pipeline Benisaf
Benisaf - Algeria
1.420 mm x 11,9 mm x 6,566 km
2012-2013
Natural Gas Line - Cameg 5112
Cameg - Algeria
20" x 10.000 Ton/28" x 30.000 Ton
2011-2013
Natural Gas line Botas Diyarbakir Pipeline Project
Botas Diyarbakir Turkey
400/1000 mm x 43 km
2011-2013
Water Transmission Project Italy
not given
1200 mm x 23,5 km
2010-2013
Natural Gas Line- Botas Kilis Project
Botas Turkey
not given
2012-2013
Transgaz Natural Gas Line
Transgaz - Romania
700/800 mm x 40 km
2011-2013
Water Pipeline Torrevieja
Torrevieja - Spain
1.219 mm x 7,1 mm - 2,926 km - 1.320 mm x 7,9 mm x 5,244 km
2010-2013
Water Pipeline Montornes La Roca
Montornes La Roca - Spain
813 mm x 7,1 mm - 2,536 km
2010-2013
Water Pipeline Isdemir
Isdemir - Turkey
1.829 mm x 16 mm - 8,171 km/1.219 mm x 16 - 0,200 km
2012-2013
Water Pipeline Pedro Arco
Pedro Arco- Spain
610 mm x 5 mm - 0,730 km/711 mm x 5,6 mm - 3,22 km - 914 mm x 6,4 mm - 4,850 km/813 mm x 6,4 - 1,165 km
2012-2013
Water Pipeline Torrevieja
Torrevieja - Spain
1.620 mm x 9,5 mm - 5,680 km/1.420 mm x 8,7 mm - 7,724 mm